Skip to content ↓

Week Beginning 7.10.24

Eagles spent the afternoon creating and building Roman Roads on the field.

We looked at the process of digging trenches, lining the trench with larger stones and sticks.  Then layered small stones and sand.  We then covered it with a layer of mud and made our top surface with leaves.  We added kerbsides with sticks.  Some even tried to build aqueducts!

We had lots of dirty hands and happy faces.